How we set up, work around your building, and close out — mobilization, access, protection of occupied property, and demobilization.
OSHA 1926 Subpart L (scaffolds), Subpart M (fall protection), 1926.1153 (respirable silica); ANSI/SPRAT or IRATA for rope access; ANSI A10.8; local AHJ permitting and right-of-way requirements; association rules and recorded easements where applicable.
General conditions are carried either as a percentage of contract value or as discrete line items for mobilization, access, protection, and demobilization — whichever gives ownership the clearer picture. The range is wide and genuinely project-specific: a ground-accessible two-story facade and an occupied twenty-story tower requiring swing stage and night work are not comparable. Access, phasing, occupancy, deck loading limits, and the conditions found once work is opened up all move the number materially. Every figure is confirmed against the documented conditions before it reaches a proposal.