HomeTrades › Windows
WINDOWS
MAPPING & QUANTIFICATION
← All Services
EnvelopeCSI 08 51 00 / 08 44 00
SCOPE OF WORK

Window and glazing work unit by unit: wet seals, IGU replacement, perimeter sealant, and flashing corrections.

Applicable Standards

AAMA 501.2, 502, 503; ASTM E1105, E783, E330, E331, E2112; FBC Florida Product Approval; NFRC 100/200; ASHRAE 90.1

Window & Curtain Wall Assessment
  • Visual condition survey: document all failed sealant, cracked glass, condensation, and frame deficiencies.
  • Water hose testing (AAMA 501.2): minimum 3 representative openings per elevation.
  • Air leakage testing (ASTM E783): quantify air infiltration at selected windows and CW units.
  • IR thermography: identify thermal bridging, condensation risk zones, and insulation deficiencies.
  • Wet seal service life assessment: age, durometer, adhesion condition, movement crack evidence.
Wet Seal Replacement
  • Remove all glass-to-frame and frame-to-wall sealants; clean with appropriate solvent; allow to dry 4 hours.
  • Apply structural silicone (DOWSIL 983, Tremco Proglaze ETA, or equal) by certified applicator.
  • Tool all joints to smooth concave profile; post-installation water test on minimum 10% of completed seals.
IGU Replacement
  • Standard (non-impact): specify U-value and SHGC per ASHRAE 90.1 / NFRC; minimum U-0.25.
  • Impact-rated (FBC/HVHZ): Florida Product Approval required; PGT, CGI, WinDoor, or approved equal.
  • High-performance: U-0.18 or better for LEED and energy code upgrade applications.
  • Coordinate with structural for curtain wall anchor capacity to carry weight of new glass units.
Perimeter Flashing & Air Barrier
  • Install flexible flashing tape at all frame-to-wall interfaces; integrate with building WRB / air barrier.
  • All four sides of each opening; lap minimum 3" onto adjacent WRB and onto frame.
  • Approved tapes: Huber ZIP System Tape, 3M 8067, Henry Blueskin VP100, Pro Clima products.
Historic Window Restoration
  • Wood frame: epoxy consolidant for rot repair; replacement sections where beyond repair.
  • Glazing compound: remove all failed putty; reglaze with linseed oil or synthetic compound.
  • Hardware: clean and lubricate all operable hardware; replace sash cords, balances, and latches as needed.
Explore all trades
MORE TRADES
Concrete & Structural
Concrete Repair
Cast-in-Place
Precast
CMU
ICF Walls
Foundations
Epoxy Injection
Grout Injection
Steel
Waterproofing & Joints
Coatings
Sealants
Expansion Joints
Roofing
Facade & Finishes
Facades
Masonry
Windows
Siding
Paint