Structural crack repair by low-pressure epoxy injection, with widths and lengths mapped before a single port is set.
ACI 224.1R, ASTM C881, ASTM C882, ICRI Technical Guidelines 310.2R, ACI 318
Post-injection core (at EOR request): drill through crack to verify fill continuity. Maintain injection log: port locations, materials, pressures, and volumes injected per crack.