ICF
WALL SYSTEMS
← All Services
StructuralCSI 03 11 19
SCOPE OF WORK

Insulated concrete form wall systems: placement and consolidation, bracing and alignment, openings and embeds, and repair or finishing of existing ICF assemblies.

Applicable Standards

TMS 0402, ACI 530, ASTM C90 (CMU units), ASTM C270 (mortar), ASTM C476 (grout), IBC Chapter 17 special inspections

CMU Condition Assessment
  • Visual survey and crack classification of all CMU walls: structural vs.
  • non-structural.
  • Moisture investigation: probe and bore-scope to trace water infiltration paths.
  • Drainage assessment: verify weeps at base of cavity walls; inspect flashing at lintels and shelf angles.
  • Code compliance review: TMS 0402 structural adequacy vs.
  • current seismic and wind requirements.
New CMU Construction
  • Reinforced CMU per TMS 0402 / ACI 530: layout, rebar, grouting, and mortar per structural drawings.
  • Grout: fine grout for 4" cells and smaller; coarse grout for 6" cells and larger (ASTM C476).
  • Special inspections per IBC Chapter 17: continuous inspection during grouting of reinforced masonry.
  • CMU types: standard, split-face, ground-face, lightweight, and insulated per architectural requirements.
CMU Repointing & Repair
  • Repointing: Type S mortar for structural CMU; Type N for decorative; remove to 3/4" min.
  • depth.
  • CMU crack repair: rout and sealant for non-structural; epoxy injection for structural.
  • Bond beam and lintel installation: grout-filled bond beams; new steel lintels with proper bearing.
CMU Coatings & Waterproofing
  • Block filler primer: fill open CMU pores before finish coat.
  • Elastomeric finish coat: 2-coat system minimum 20 mil DFT; waterproof above-grade CMU walls.
  • Interior parging: 2-coat Portland cement plaster on interior CMU.
Post-Installed Anchors
  • Core drill and clean hole; apply epoxy adhesive (Hilti HIT-RE 500 or equal).
  • Install anchor per manufacturer torque and embedment requirements.
  • Pull-out test per ASTM E488 on minimum 5% of installed anchors; report to EOR.
Explore all trades
MORE TRADES
Concrete & Structural
Concrete Repair
Cast-in-Place
Precast
CMU
ICF Walls
Foundations
Epoxy Injection
Grout Injection
Steel
Waterproofing & Joints
Coatings
Sealants
Expansion Joints
Roofing
Facade & Finishes
Facades
Masonry
Windows
Siding
Paint